Year: 2007
Location: Trieste, Italy
Client: CMG srl
Size: 2,100 m²
Status: completed
Photographs: Stefano Graziani
The existing building in which the offices are housed was over cladded with aluminium insulated panels to improve thermal efficiency. The rest of the warehouse was to be used for steel carpentry work and the assembly of components for hydraulic systems. A new canopy was erected to the east side of the main volume and was equipped with heavy duty cranes for the loading and unloading of large components from lorries and trucks.